CORRECT INSTALLATION OF PERISTALTIC PUMP TUBING

Correct Installation of Peristaltic Pump Tubing

Correct Installation of Peristaltic Pump Tubing

Blog Article

Correct Installation of Peristaltic Pump Tubing


Preparation



  1. Power Off and Isolate:Before starting, turn off the peristaltic pump and close the inlet valve to ensure the equipment is in a safe state.

  2. Prepare Materials:Gather the necessary tubing, clamps, and peristaltic pump tubing.


Installing Tubing and Securing



  1. Remove Old Tubing:Open the clamps on the pump head and remove the old peristaltic pump tubing.

  2. Insert New Tubing:Place the new peristaltic pump tubing between the clamps and tighten firmly.

  3. Connect to Inlet and Outlet:Connect one end of the tubing to the inlet port and the other end to the outlet port.

  4. Adjust Angle:Adjust the angle of the clamps to ensure the peristaltic pump tubing is securely fastened and free from any reverse bends.


Adjusting Tubing Position and Tension



  1. Check for Proper Contact:Gently press down on the center of the peristaltic pump tubing to ensure it is in close contact with the roller. If not, adjust the position slightly.

  2. Verify Tension:Check that the tubing tension is appropriate. It should not be too tight or too loose, as this can affect pump operation.


Starting the Equipment



  1. Confirm Installation:Once the peristaltic pump tubing is installed, connect the power supply.

  2. Open Inlet Valve:Open the inlet valve and gradually adjust the pump's flow rate and speed.

  3. Monitor Operation:Under normal conditions, there should be no leakage or abnormal noise during the operation of the peristaltic pump tubing. If any issues arise, stop the pump immediately.


Precautions



  1. Follow Instructions:Always follow the correct installation procedures for peristaltic pump tubing.

  2. Avoid Damaged Tubing:Do not use expired or damaged peristaltic pump tubing.

  3. Gentle Cleaning:When cleaning the peristaltic pump tubing, avoid using harsh or chemically reactive cleaning agents.

  4. Safety First:Always wear gloves and a mask when installing and maintaining peristaltic pump tubing to ensure personal safety.


In summary, accurate and meticulous operation and a stable equipment condition can ensure the normal operation of the equipment and improve production efficiency.

That's a wrap on our peristaltic pump tubing installation tutorial from JIHPUMP! Have more questions? Don't hesitate to reach out to us in a private message.

Report this page